Key point of NFV hardware resource pool planning and construction
Major operators have been deploying NFV in succession
after hardware and software decoupling of NFV
hardware and software need to be separately planned and constructed.Based on the initial construction requirements of NFV deployment
the key factors were analyzed which should be considered in the planning and construction of the hardware resource pool and the machine room infrastructure.The calculation
storage
network equipment matching requirements were expounded.And the blade and rack service was compared.The hardware and network configuration of two layers and SDN networks were enhanced by the hardware
magnetic array and distributed storage.The hardware configuration mode and key considerations were studied.The hardware redundancy requirements under different scenes were analyzed
and the key requirements of the NFV hardware pool planning and construction were obtained.
SUN Z Z , GONG J , DUAN Y , et al . Research on software defined storage technology for the next-generation data center [J ] . Telecommunications Science , 2014 , 30 ( 1 ): 39 - 43 .
GU R , WANG R X , LI C , et al . Analysis on network scheme and resolution test of SDN/NFV technology co-deployed in cloud datacenter [J ] . Telecommunications Science , 2016 , 32 ( 1 ): 126 - 130 .